InternationalCase study
Overseas residences
UK-made metalwork, resolved for an international site.
ContextInternational coordination
01The commission
UK-made metalwork, resolved for an international site.
Architectural metalwork is developed with remote design teams, local consultants and project-specific installation requirements. Controlled reviews keep geometry, interfaces and finish aligned across distance and disciplines.
DisciplineInternational
ProjectOverseas residences
LocationInternational coordination
Project focus
Drawn, developed and made as one.
01
Remote design teams
02
Local coordination
03
Installation strategy
Our approach
Resolved before it reaches site.
01
One source of truth
Drawings, dimensions, finishes and responsibilities are reviewed with every project team before production.
02
Discretion by default
Access to project information, workshop photography and external communication is managed around the commission.
03
Installation planned early
Access, lifting, protection, tolerances and local support are considered before assemblies enter production.
Related capabilities
Material knowledge.
01
Patinated bronze
02
Brushed stainless
03
Blackened steel
04
Smoked oak
05
Natural stone

Next case study